bigbounce/spin-torsion cosmology research program
research live

SurveysACT

ACT DR6

Atacama Cosmology Telescope Data Release 6. Formally quarantined under Path-C protocol: cross-transfer autoencoder gate-FAILED both criteria (val_loss 22,420 vs 0.30 threshold; <1% injection-recovery at 5sigma). No native retrain has been run. The 200-patch cross-transfer block is preserved in Paper 3 Appendix as a methodological lessons-learned artifact only.

QC FAIL
20K patches
0 anomalies ()
Microwave (90-220 GHz)
Readiness
QC FAIL
ACT

FORMALLY QUARANTINED (Paper 3 Appendix). Cross-transfer val_loss=22,420 (~7x10^4 above the 0.30 gate). Injection-recovery <1% at 5sigma. No native retrain executed. Excluded from all headline numbers.

Cost~$2
Runtime~5 min
Sources20K patches
Anomalies0
Rate
BandMicrowave
Key Findings
Results that define how this survey should be used in the paper set.
  • 01QUARANTINED: cross-transfer val_loss=22,420 (gate threshold: 0.30)
  • 02Injection-recovery <1% at 5sigma (gate threshold: 50%)
  • 03Contributes 0 objects to Path-C catalog headline
  • 04200-patch cross-transfer block documented in Appendix for audit only
Pipeline
ModelCross-transfer (quarantined — no native retrain)
WavelengthMicrowave (90-220 GHz)
Cost~$2
Runtime~5 min
Top Anomalies